Infrastructure

The Whitewater University Technology Park provides top-quality access to excellent infrastructure:

  • Affordable utilities, internet, roadways and more.

  • Minimum 38-foot roadways with 18 inch base, curb and storm sewer

  • Sanitary sewers sized from 12 to 24 inches, and a treatment plant with more than 2 million gpd in unused capacity

  • Water mains from 12 to 16 inches, often looped, and 5 million gpd in excess pumping capacity

  • Electrical power supply up to 138 kV

  • Natural gas supplied by a major pipeline bordering the park

  • Advanced telecommunications on multiple SONET rings

  • Dark Fiber Optic connectivity with 1 gigabyte service