Infrastructure
The Whitewater University Technology Park provides top-quality access to excellent infrastructure:
Affordable utilities, internet, roadways and more.
Minimum 38-foot roadways with 18 inch base, curb and storm sewer
Sanitary sewers sized from 12 to 24 inches, and a treatment plant with more than 2 million gpd in unused capacity
Water mains from 12 to 16 inches, often looped, and 5 million gpd in excess pumping capacity
Electrical power supply up to 138 kV
Natural gas supplied by a major pipeline bordering the park
Advanced telecommunications on multiple SONET rings
Dark Fiber Optic connectivity with 1 gigabyte service